SOME MAJOR PROJECT

on ENG/EPC/MC Basis.

100%

FOOLAD SANG

Lime Plant
100%

GOL-E-GOHAR

Pelletizing Plant
93.23%

GOHARZAMIN

Pelletizing Plant
34.45%

SANGAN IRON ORE COMPLEX

Iron Ore Concentrate Plant
100%

CALCIMIN

Zinc Concentrate Production with BZS Method
100%

ESCO

Reconstruction of the Existing RM650 to Produce Rail U33 and UIC60
100%

IRAN AlLLOY STEEL COMPANY

Steel making
88%

ESFAHAN REFINERY

Loading Petroleum Producet
99%

MSC(SABA)

Steel making Expansion Project
100%

ASHTON BULK(7,200tph)

Stacker Counter Weight Frame Design & Analysis
100%

ASHTON BULK (10,000tph)

Stacker Counter Weight Frame Design & Analysis
2.65%

BMISCO

Pelletizing Plant
100%

SBR

Company Building
100%

ESCO

Reuse for Irrigation zarin shahr Treatment Plant Effluent
100%

QAZVIN MUNICIPALITY

Qazvin MSW Leachate Treatment plant
100%

SOUTH ROUHINA STEEL COMPLEX CO

Engineering Services for South Rouhina Steel Making
100%

QAZVIN MUNICIPALITY

Qazvin Waste Transfer Station
5.6%

Foolad Gostar Almass

DR Plant
100%

Fire alarm& Fire Fighting System for kharazi Mega module

Gol-E-Gohar Pelletizing Plant NO.2

Gol-E-Gohar Pelletizing Plant NO.2

On EPC Basis

Client:Gol-E-Gohar
Location:Sirjan
Start Date :2012
End Date :2016
Technology Provider : Outotec
Capacity : 5MTPY
Status : In Operation

Foolad Sang Lime Plant

Foolad Sang Lime Plant

On EPC Basis

Client:Msc
Location: Isfahan
Start Date :2012
End Date :2018
Technology Provider :Chisaki Technology
Capacity : 3x400 TPD
Status : In Operation

Reconstruction Existing RM650 to Produce Rail U33, UIC 60

Reconstruction Existing RM650 to Produce Rail U33, UIC 60

MC Services

Client:ESCO
Location:Isfahan
Start Date :2014
End Date :2018
Technology Provider : Kuttner
Capacity : 240,000(TPY)
Status : In Operation

Slab Continuous Casting Machine #5

Slab Continuous Casting Machine #5

Engineering

Client:MSC
Location: Isfahan
Start Date :2014
End Date :2016
Technology Provider : Xian
Capacity : 2(MTPY)
Status : In Operation

SABA Steelmaking (CSP) Plant Expansion

SABA Steelmaking (CSP) Plant Expansion

MC Services

Client:MSC
Location:Isfahan
Start Date :2012
End Date :2018
Technology Provider : Danieli
Capacity : 1.7(MTPY)
Status : In Operation

Goharzamin Pelletizing Plant NO.2

Goharzamin Pelletizing Plant NO.2

Engineering

Client:Goharzamin
Location:Sirjan
Start Date :2014
Technology Provider : Outotec
Capacity : 5(MTPY)
Status : In Progress

Sangan Iron Ore Concentrate Plant

Sangan Iron Ore Concentrate Plant

Engineering

Owner:Khorasan Steel Company
Client:kayson
Location:Sangan
Start Date :2014
Technology Provider : Outotec
Capacity : 5(MTPY)
Status : In Progress

MIDA Steel Making & HRM at SRSC

MIDA Steel Making & HRM at SRSC

Engineering

Client:SRSC
Location:Dezful
Start Date :2014
Technology Provider : Danieli
Capacity : 450,000 tpy
Status : In Progress

Yazd I Steel Making Plant

Yazd I Steel Making Plant

Engineering

Client:IASCO
Location:Yazd
Start Date :2014
End Date :2016
Technology Provider :Saralle
Capacity : 700,000(TPY)
Status : Finished

Zinc Concentrate Production by BZS Method

Zinc Concentrate Production by BZS Method

on EPC Basis

Client:Calcimin
Location:Zanjan
Start Date :2016
End Date :2018
Capacity : 320(TPD)
Status : In Operation

Esfahan Refinery- Loading-Petroleum Product

Esfahan Refinery- Loading-Petroleum Product

On EPC Basis

Client:Esfahan Refinery
Location:Isfahan
Start Date :2016
Status : In Progress

Direct Reduction Plant at Saqqez

Direct Reduction Plant at Saqqez

MC Services

Client:Mass Group
Location:Saqqez
Start Date :2017
Technology Provider :Midrex
Capacity : 1 (MTPY)
Status : In Progress

Stacker-Reclaimer Frame Design   ST2

Stacker-Reclaimer Frame Design ST2

Engineering

Client:Ashton Bulk
Location:Australia
Start Date :2015
Capacity : 7,200 TPH
Status : Finished

Stacker-Reclaimer Frame Design ST1

Stacker-Reclaimer Frame Design ST1

Engineering

Client:Ashton Bulk
Location:Australia
Start Date :2015
Capacity : 10,000 TPH
Status : Finished

Qazvin MSW Leachate Treatment Plant

Qazvin MSW Leachate Treatment Plant

Engineering & supervision

Client:Qazvin Municipility
Location:Qazvin
Start /End Engineering:2007-2009
Strat/End Supervision: 2011-2015
Hydraulic Capacity: 60 m3 PD
Process Capacity: 30 m3 PD
Status : Finished

Settler for Steel making & Coke making

Settler for Steel making & Coke making

Engineering & supervision

Client:ESCO
Location:Isfahan
Start Date:2015
End Date: 2016
Status : In Operation

Material Handling for DR Plant at SABZ

Material Handling for DR Plant at SABZ

Engineering

Client:MMTE
Location:Sabzevar
Start Date:2008
End Date: 2012
Capacity : 1 MPTY
Status : In Construction

Material Handling for DR Plant

Material Handling for DR Plant

Engineering

Client:MMTE
Location:CHBK
Start Date:2008
End Date: 2012
Capacity : 1 MPTY
Status : In Operation

GALLERY

More than 200 Projects done by SBR that You can See Some Projects in the from of Gallery
read more...

About Us

SBR has been Established as an EPC Private Company in the fields of Steel, Mine, oil & Gas and Environment since 1996
read more...

Holding